Pool Packages
Our Pricing
Afforable Pricing Plan
Feature | POOL PACKAGE Starting at $56,887 | POOL & WATERFALL FEATURE PACKAGE Starting at $63,779 | POOL/SPA COMBO PACKAGE Starting at $107,379 |
---|---|---|---|
Size | Pool: 15 ft by 25 ft | Pool: 15 ft by 25 ft | Pool: 15 ft by 25 ft Spa: 6 ft by 6 ft raised |
Perimeter | Up to 80 ft | Up to 80 ft | Up to 110 ft |
Depth | Play pool depth up to 5 ft | Play pool depth up to 5 ft | Play pool depth up to 5 ft |
Baja Shelf | 6 ft Baja Shelf | 6 ft Baja Shelf | 6 ft Baja Shelf |
Additional Features | Autofill Leveler Pool Skimmer Vacuum Line | Autofill Leveler Pool Skimmer Vacuum Line | Autofill Leveler Pool Skimmer Vacuum Line |
Waterfall Feature | N/A | 4 ft wide by 2 ft tall Scuppers or Sheer Descent Porcelain or Stacked Stone Face Natural Stone Caps | N/A |
Pool Equipment | Intellicenter Pool Automation Pentair Intelliflo 3HP 420 Sq Ft Cartridge Filter (2) Color LED Pool Lights Low Voltage with Transformer 2 Wheel Pool Cleaner | Intellicenter Pool Automation Pentair Intelliflo 3HP 420 Sq Ft Cartridge Filter (2) Color LED Pool Lights Low Voltage with Transformer 2 Wheel Pool Cleaner | Intellicenter Pool & Spa Automation (2) Pentair Intelliflo 3HP Pumps 1 Blower 1 400K BTU Gas Heater 420 Sq Ft Cartridge Filter (3) Color LED Pool Lights Low Voltage with Transformer 2 Wheel Pool Cleaner |
Finishes | Natural Stone Decking up to 300 Sq Ft 6 by 6 Porcelain Waterline Tile Universal Mini Pebble | Natural Stone Decking up to 300 Sq Ft 6 by 6 Porcelain Waterline Tile Universal Mini Pebble | Natural Stone Decking up to 500 Sq Ft 6 by 6 Porcelain Waterline Tile Universal Mini Pebble |
Electrical & Plumbing | Up to 50 ft electrical run from main panel Up to 40 ft plumbing run to skimmer | Up to 50 ft electrical run from main panel Up to 40 ft plumbing run to skimmer | Up to 50 ft electrical run from main panel Up to 40 ft plumbing run to skimmer |
Services | 1 Professional equipment and pool operations training 1 Chemical start up visit | 1 Professional equipment and pool operations training 1 Chemical start up visit | 1 Professional equipment and pool operations training 1 Chemical start up visit |
Action | Contact Us | Contact Us | Contact Us |
Faqs
Frequently Asked Questions
50 percent as soon as estimate is approved and 50 percent due upon completion
1. 15% Upon signing contract
2. 25% Before excavation
3. 25% Before shotcrete
4. 25% Before installation of decking materials
5. 10% Upon pebble application
1. Drain the pool shut off equipment
2. Demolition typically ¾ of a day
3. Tile installation (6 by 6 typically if the pool is more curved 3 by 3 may be better option
see what's currently there)
4. Structural inspection
5. Pressure test ( if approved)
6. Pebble application
7. Acid wash
8. Fill
9. Cool Deck (If any cool deck is to be done we do the grinding at some point before
pebble then we will do the texture acrylic and paint last. This is to ensure the decking
doesn't get scuffed up from all of the crews during the remodel process)
1. Backfill material
2. Steel and Epoxy anchoring
3. Concrete (Must be watered 2-3 times a day for the first 10 days)
1. Mainly National Pool TIle
1. We use Universal Mini pebble based out of glendale. The concrete they use is from Mexico and aggregate is from local mines.
We can add a polishing aspect before acid wash to make the surface smoother. We can only polish the floors add’s $1,250. Or we can polish both the floors and walls for $2,500.
Yes we are contractor license 338476
Three years but we have combined team experience of 30+ years in the industry
1. Tape of the existing pool so no debris gets in the water
2. Grind down to the concrete most of the old cool decking will be removed
3. Patch any cracks prior to acrylic coat (can be patched with epoxy or concrete depending
on how big the cracks are)
4. Apply new acrylic, texture, and paint to color of choice